:

View

[ Geneva Lake's map

View

View


[ Advanced Options

[ Geneva Lake's map

[ PDF Timetable

Max. no. of changes Max. waiting time

PDF Timetable - Winter (10/12/2017 - 14/04/2018)


No cruise was found

Info trafic

Infrastructures

Unique infrastructures across Lake Geneva.

CGN-Technique is currently transferring several boats to dry dock in order to reduce refit costs, and is able to accommodate private boats (≥ 15 tonnes) while maintenance of its own vessels is under way.

The floating dock and dry dock are supplied with all the amenities (water, compressed air, electricity) required to carry out up-to-date maintenance work.

The dry dock is covered and closed. It is supplied with two overhead cranes weighing 10 tonnes, and is ideal for all refit work.

Floating dock

  • Length: 65 meters
  • Width: 16 meters
  • Lifting capacity: 700 tonnes
  • Lift duration: 2 hours

Covered dry dock Length:

  • Length : 80 meters
  • Width: 16 meters
  • Dry-dock session duration: 3 hours

 

Contact us

  • Crossings Switzerland-France :
    the opposite shore has never been so close!

    CGN mobilité
  • Tourist cruises :
    relaxation and fine dining guaranteed – head for the water!

    CGN horizons
  • Boat rentals :
    an exclusive place for your events!

    CGN exclusive
  • Boat owners :
    our expertise at your service!

    CGN technique

To install this web app on your iPhone/iPad:
PressQ then "Add to homepage screen"